Installation Procedure
- Position the engine ground cable to the engine.
- Install the bolt securing the engine ground cable to the generator.
Tighten: Tighten the generator mounting bolt to 50 N.m (37 lb ft).
- Install the bolt (1) securing the engine ground cable (2) to the right side body frame rail.
Tighten: Tighten the engine ground cable bolt to 50 N.m (37 lb ft).
- Install the upper filler panel. Refer to Filler Panel Replacement - Upper in Body Front End.
NOTE:
Refer to Fastener Notice in Cautions and Notices.