Installation Procedure
- Connect the electrical connector.
- Install the sun load sensor (2) to the upper trim panel.
- Install the instrument panel upper trim panel. Refer to Trim Panel Replacement - Instrument Panel (I/P) Upper in Instrument Panel, Gages and Console.