Installation Procedure
Battery (6) - Install
- Battery Hold Down Retainer (2) - Install
- Battery Hold Down Retainer Nut (1) - Install and tighten 9 N.m (80 lb in)
- Battery Hold Down Retainer (4) - Install
- Battery Hold Down Bolt (3) - Install and tighten 22 N.m (16 lb ft)
- Battery Vent Hose (5) - Connect
Battery Distribution Fuse Block (2) - Install
- Battery Positive Post Clamp Nut (1) - Tighten 4.5 N.m (40 lb in)
Battery Distribution Fuse Block Cover (1) - Install
- Connect the battery negative cable. Battery Negative Cable Disconnection and Connection (Without KL9) Battery Negative Cable Disconnection and Connection (With KL9)
Rear Compartment Side Trim Panel-Left Side (2) - Install - Rear Compartment Side Trim Replacement - Left Side (With LHN)Rear Compartment Side Trim Replacement - Left Side (With LGX)
CAUTION:
Refer to Fastener Caution