LEMON Manuals: Even more car manuals for everyone
Home >> Buick >> 2019 >> Envision Base >> Repair and Diagnosis >> Electrical >> Charging Systems >> Battery, Starting System And Charging System >> Diagnostic Information and Procedures >> DTC B1517 >> Circuit/System Verification

Circuit/System Verification

  1. Ignition/Vehicle & All vehicle systems - Off
  2. NOTE:

    The battery voltage should stabilize after a few minutes of turning the ignition/vehicle Off.

  3. Test for 12.4 to 12.8 V between the test points: Battery Positive Post & Battery Negative Post
    • Go to next step: If between 12.4 and 12.8 V 
  4. Engine - Running - For greater than 15 s
  5. Accessories - Off
  6. Test for 13.4 to 15 V between the test points: Battery Positive Post & Battery Negative Post
    • Go to next step: If between 13.4 and 15 V 
  7. Verify the scan tool parameter: Battery Voltage @ K9 Body Control Module = Within 1 V of the battery voltage
    • If not within 1 V of each other 

      Refer to: Circuit/System Testing

    • Go to next step: If within 1 V of each other 
  8. Verify the scan tool parameter: Ignition Voltage @ Control Module = Within 1 V of the battery voltage
    • If not within 1 V of each other 

      Refer to: Circuit/System Testing

    • Go to next step: If within 1 V of each other 
  9. All OK.