Installation Procedure
Battery Current Sensor (2) - Install
- Battery Negative Cable (3) - Install
- Battery Negative Cable Ground Nut (1) - Install and tighten 16 N.m (12 lb ft)
Electrical Connector (2) @ Battery Current Sensor (1) - Connect
- Connect the negative battery cable. Battery Negative Cable Disconnection and Connection (Without KL9)
- Install the left side rear compartment side trim panel. Rear Compartment Side Trim Replacement - Left Side (With LHN)Rear Compartment Side Trim Replacement - Left Side (With LGX)
CAUTION:
Refer to Fastener Caution