Installation Procedure
- Position the generator to the engine.
- Install the positive battery lead to the generator.
- Install the generator output BAT terminal nut.
Tighten: Tighten the generator output BAT terminal nut to 20 N.m (15 lb ft).
- Install the protective boot to the generator output BAT terminal.
- Connect the electrical connector to the generator.
- Install the generator stud (2) to the generator bracket.
- Install the generator bolts (1, 3) to the generator bracket.
- Tighten the generator bolts and stud in the order described. The following is a mandatory torque sequence:
Tighten:
- Tighten the generator bolt (1) to 50 N.m (37 lb ft).
- Tighten the generator stud (2) to 50 N.m (37 lb ft).
- Tighten the generator rear bracket bolt (3) to 50 N.m (37 lb ft).
- Install the generator rear brace. Refer to Generator Brace Replacement (L26) .
- Install the drive belt. Refer to Drive Belt Replacement (L26) .
- Connect the negative battery negative cable. Refer to Battery Negative Cable Disconnection and Connection (L26) or Battery Negative Cable Disconnection and Connection (LY7) or Battery Negative Cable Disconnection and Connection (LS4) .
NOTE:
Refer to FASTENER NOTICE
.
IMPORTANT:
Do not tighten the stud.
IMPORTANT:
Do not tighten the bolts.