Adjustment (Floor Shift)
- Place shift lever in Park. Disconnect park lock cable wire from pin at base of shift lever (leave cable sheath connected). Unlock park lock cable adjuster at base of shift lever (pull button up). Turn lock cylinder to RUN position to energize BTSI solenoid.
- Connect park lock cable wire to pin at base of shift lever. Lock the park lock cable adjuster (push button down). Recheck BTSI system. If system does not operate as specified, repeat procedure.