Placing System in Operation
After all connections have been made, proceed as follows:
- Evacuate system using a vacuum pump. See EVACUATING THE SYSTEM .
- Charge the system with new Refrigerant-12. See CHARGING THE SYSTEM .
- Leak test the system with particular attention to all new connections and components. See LEAK TESTING .
- Make a performance test of the air conditioner. See PERFORMANCE TESTING .