Install the BDC control unit
- Connect the connector of the positive battery cable (1) to the BDC control unit (4).
It Is essential to observe the sequence:
- Install the positive battery cable connector (1) in the direction of the arrow.
- Check that retaining lug (2) is engaged correctly.
- Close lock (3) arrow direction.
- Guide in the BDC control unit (1).
- Connect all connectors (1) and lock.
- Guide in the BDC control unit (2) in the direction of the arrow.
- Connect all connectors (1) and lock.
- Insert cover (2) in arrow direction.
- Check the detents (1).
- Tighten screw (2) at cover (3).TIGHTENING TORQUE SPECIFICATIONS
Body Domain Controller (BDC) Sheet metal screw 4, 8X16 tightening torque 1.2 Nm - Position the carpet (1).
Follow-up work
- Refer to INSTALLING SIDE TRIM PANEL IN FOOTWELL ON RIGHT A-PILLAR .
- Refer to INSTALLING THE FRONT DOOR SILL COVER STRIP .
- Refer to INSTALLING RIGHT FOOTWELL TRIM .
- Refer to RECONNECTING ALL BATTERY GROUND LEADS .
- Refer to ENCODING/PROGRAMING CONTROL UNIT(S) .
- Refer to INITIALIZING COMPONENT PROTECTION .
- Refer to ACTIVATING THE 48 V ELECTRICAL SYSTEM .
- Refer to INITIALIZING COMPONENT PROTECTION .