Action in service
Work through all stored faults of the partner control unit according to the test plan.
Especially faults that effect the vicinity of the partner control unit (e.g. connected sensor system).
These types of faults are secondary faults.
If there are more procedures in the test schedule, then additional repair measures must be taken.