31 00... Front axle + steering: wheel/chassis alignment check must be carried out after the following work
A wheel/chassis alignment check . See 32 00 150 KDS CHASSIS/WHEEL ALIGNMENT CHECK WITH VEHICLE LOAD UP TO DESIGN POSITION or 32 00 155 KDS CHASSIS/WHEEL ALIGNMENT CHECK WITH RIDE HEIGHT MEASUREMENT WITHOUT VEHICLE LOAD must be carried out after the following work:
- Release of following screw/bolt connections:
- Steering gear to front axle carrier
- Control arm to front axle carrier
- Support bearing to body (if centering pin is missing)
- Tie rod end to tie rod
- Replacement of following parts:
- Front axle carrier
- Steering gear
- Gaiter (if the tie rod end has to be screwed off)
- Control arm
- Support bearing (if centering pin is missing)
- Swivel bearing
- Tie rod end
- Tie rod