86 10... Disassembly of loading ramp frame/disassembly of rail, left/right: Installation
Tightening Torque,
Release screws (1, 2) on left and right sides of loading ramp frame (3).
Use new self-locking nuts.
Tightening Torque, 86 10 8AZ
Release screws (1, 2, 3).
Use new self-locking nuts.
Tightening Torque, 86 10 9AZ