11 00 590 Exchange engine (N54, N54T)
Necessary preliminary tasks:
- Remove and install ENGINE .
- Mount engine on ASSEMBLY STAND .
- If necessary, remove foreign bodies from turbocharger group.
- Check all assemblies and convert to replacement power plant.
Remove transportation locks (1).
NOTE:
Catch escaping engine oil with a suitable cloth (2).
Transportation locks (1) are no longer needed.
Modify screw plugs (1) from old power plant.
Insert screw plugs (1).
Tightening torque: 11 42 11AZ .
Secure OIL COOLER LINES with mounting bar (2).
Assemble engine.