33 00... Rear Axle: Wheel/Chassis Alignment Check Must Be Carried Out After The Following Work
A wheel/chassis alignment check must be carried out after the following work:
- Release of following screw/bolt connections:
- Swinging arm, front/rear, to rear axle carrier
- Swinging arm to integral link / wheel carrier
- Integral link to wheel carrier
- Guide arm to rear axle carrier
- Control arm to rear axle carrier
- Replacement of following parts:
- Rear axle carrier
- Swinging arm
- Integral link
- Wheel carrier / ball joint
- Control arm
- Guide arm