Emergency operation
- E90, E91, E92, E93
If the power supply is interrupted during operation, various signal conditions could be lost.
When power is available again, the button must be pressed and held for 5 seconds. This will switch the drive on (emergency operation).
If the power supply is interrupted, the trailer coupling cannot be released.