Servotronic Initialization
A short initialization phase (approximately 1 second) is necessary to achieve the characteristic curve as fast as possible during the starting procedure. During this phase, vehicle standstill is detected. A current flow plausibility test is conducted and concluded within the initialization phase (test for short to B+ or ground).