64 99... Reading out flashcode: Notes
Test precondition:
Check function of independent park heater,
refer to 64 12 005 CHECKING FUNCTION OF INDEPENDENT HEATING (THERMO TOP S)
Instruction:
Connect inspection lamp to glow plug above peripherals box (pin allocation: refer to DIS circuit diagram). Switch on independent heating via MID or on-board monitor, switch off after 3 minutes running time and, once after-running time has elapsed, count the number of flash pulses.
NOTE:
If there is a fault, park heating switches to fault overrun automatically after 2 minutes.