Catch, Removing And Installing: Installing
- Tightening specification: 19 Nm
Installation is performed in the reverse order of removal:
NOTE:
The striker pin backing must be position with the pins -arrows- exactly in the hole.
The striker pins must be sheared off cleanly after sliding the striker pin.
If a new part is being installed, then remove the sheared off pins from the striker pin.
-- Adjust the catch. Refer to CATCH, ADJUSTING .