LEMON Manuals: Even more car manuals for everyone
Home >> Acura >> 1993 >> Integra GS-R >> Repair and Diagnosis >> Transmission >> Manual Trans >> Overhaul - YS1 >> Component Disassembly & Reassembly >> MAINSHAFT >> Inspection

Component Disassembly & Reassembly: MAINSHAFT: Inspection

  1. Inspect all parts for damage and wear. Replace if necessary. Clean all parts in new solvent, dry and lubricate all parts. Install 3rd/4th, and 5th synchro hubs with a press before lubricating them.
  2. Measure mainshaft at points "A", "B" and "C". Support mainshaft in "V" blocks. Using dial indicator to measure runout, rotate mainshaft 2 complete revolutions. Replace mainshaft if runout or any part is not within service limit. See MAINSHAFT BEARING SURFACE SPECIFICATIONS  table.
MAINSHAFT BEARING SURFACE SPECIFICATIONS

Application (1) Standard In. (mm) Service Limits In. (mm)
"A" Ball Bearing Surface 1.101-1.102 (27.98-27.99) 1.100 (27.93)
"B" Needle Bearing Surface 1.495-1.496 (37.98-38.00) 1.493 (37.93)
"C" Ball Bearing Surface 1.101-1.102 (27.99-28.00) 1.100 (27.94)
Runout Limits .0008 (.020) .0020 (.050)
(1) "A", "B" and "C" refer to measuring points indicated in Fig. Figure .
CAUTION: Use a press to install 3rd/4th and 5th synchro hub. DO NOT exceed a maximum of 4410 lbs. pressure while supporting mainshaft on blocks. Lubricate all parts only after mainshaft is complete.