Installation Procedure
- Position the generator to the engine.
- Install the positive battery lead to the generator.
- Install the generator output BAT terminal nut.
Tighten: Tighten the nut to 20 N.m (15 lb ft).
- Install the protective boot to the generator output BAT terminal.
- Connect the electrical connector to the generator.
- Install the generator stud (2) to the generator bracket.
- Install the generator bolts (1, 3) to the generator bracket.
- Tighten the generator bolts and stud in the order described. The following is a mandatory torque sequence:
Tighten:
- Tighten the bolt (1) to 50 N.m (37 lb ft).
- Tighten the stud (2) to 50 N.m (37 lb ft).
- Tighten the rear bracket bolt (3) to 50 N.m (37 lb ft).
- Install the generator rear brace. Refer to Generator Brace Replacement (L26) .
- Install the drive belt. Refer to Drive Belt Replacement .
- Connect the negative battery negative cable. Refer to Battery Negative Cable Disconnection and Connection (L26) or Battery Negative Cable Disconnection and Connection (LS4) .
NOTE:
Refer to Fastener Notice
.
IMPORTANT:
Do not tighten the stud.
IMPORTANT:
Do not tighten the bolts.