LEMON Manuals: Even more car manuals for everyone
Home >> Lexus >> 2017 >> LX 570 >> Repair and Diagnosis >> Engine Performance >> System >> Engine Control System - Diagnostic Codes (4 Of 7) >> SFI System >> DTC P144C: Open in Secondary Air Injection System Heater Control Circuit; DTC P144D: Short in Secondary Air Injection System Heater Control Circuit [09/2015 - ] >> Procedure

DTC P144C: Open in Secondary Air Injection System Heater Control Circuit; DTC P144D: Short in Secondary Air Injection System Heater Control Circuit [09/2015 - ]: Procedure

  1. INSPECT INTEGRATION RELAY (AIR PMP HTR) 
    1. Inspect the integration relay (AIR PMP HTR) (Refer to ON-VEHICLE INSPECTION [09/2015 - ] ).

    Result: 

    NG 

    REPLACE INTEGRATION RELAY 

    Result: 

    OK 

    See step  2

  2. CHECK HARNESS AND CONNECTOR (POWER SOURCE) 
    1. Remove the integration relay from the engine room relay block.
    2. Measure the voltage according to the value(s) in the table below.
      GTY612147Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Standard voltage

      Tester Connection Switch Condition Specified Condition
      1M-1 - Body ground Engine switch on (IG) 11 to 14 V
    3. Reinstall the integration relay.

    Result: 

    NG 

    REPAIR OR REPLACE HARNESS OR CONNECTOR 

    Result: 

    OK 

    See step  3

  3. CHECK HARNESS AND CONNECTOR (ECM - INTEGRATION RELAY) 
    1. Remove the integration relay from the engine room relay block.
    2. Disconnect the ECM connector.
    3. Measure the resistance according to the value(s) in the table below.

      Standard resistance

      Tester Connection Condition Specified Condition
      1N-10 - A38-14 (HAI1) Always Below 1 Ω
      1N-10 or A38-14 (HAI1) - Body ground Always 10 kΩ or higher
    4. Reinstall the integration relay.
    5. Reconnect the ECM connector.

    Result: 

    OK 

    REPLACE ECM 

    (Refer to REMOVAL [09/2015 - ] )

    Result: 

    NG 

    REPAIR OR REPLACE HARNESS OR CONNECTOR