LEMON Manuals: Even more car manuals for everyone
Home >> GMC >> 2020 >> Canyon SL >> Repair and Diagnosis >> Electrical >> Charging Systems >> Battery, Starting System And Charging System >> Repair Instructions >> Engine Wiring Harness Junction Block Replacement >> Installation Procedure

Installation Procedure

  1. GM3808305Courtesy of GENERAL MOTORS COMPANY
    CAUTION:

    Refer to Fastener Caution .

    Position the fuse block housing (2) to the vehicle. Install the cable and cable nut (1) to the fuse block (2). Tighten cable nut to 9 N.m (80 lb in).

  2. GM3808301Courtesy of GENERAL MOTORS COMPANY

    Install the fuse block (2) to the bracket and secure the 6 retainer tabs (1).

  3. GM3808297Courtesy of GENERAL MOTORS COMPANY

    Install the fuse block bolts (1). Tighten bolts to 9 N.m (80 lb in)

  4. GM3808291Courtesy of GENERAL MOTORS COMPANY

    Install the starter generator cable (2), install the starter generator cable nut (1). Tighten cable nut to 9 N.m (80 lb in)

  5. GM3808288Courtesy of GENERAL MOTORS COMPANY

    Push the upper latch to the right (arrow) and install the cover (1) to the block, insuring the 2 tab on the cover are secure.

  6. Install the engine wiring harness block cover. Refer to Engine Wiring Harness Fuse Block Cover Replacement 
  7. Connect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection .